One time measurement unit (TMU) in method time measurement system equals
One time measurement unit (TMU) in method time measurement system equals
PERT has following time estimate
PERT has following time estimate
Break-even analysis consists of
Break-even analysis consists of
In the perpetual inventory control, the material is checked when it reaches its
In the perpetual inventory control, the material is checked when it reaches its
Work sampling observations are taken on the basis of
Work sampling observations are taken on the basis of
In Lincoln plan (one type of group incentive plan), the amount of the profit which an employee receives in addition to the guaranteed basic pay/wages, is based on:
In Lincoln plan (one type of group incentive plan), the amount of the profit which an employee receives in addition to the guaranteed basic pay/wages, is based on:
In a PERT chart
In a PERT chart
Work sampling is applied for
Work sampling is applied for
M.T.M. is used to
M.T.M. is used to
The most important function of inventory control is
The most important function of inventory control is
A feasible solution to the linear programming problem should
A feasible solution to the linear programming problem should
What does symbol 'V' employ in work study
What does symbol 'V' employ in work study
In time study, the rating factor is applied to determine
In time study, the rating factor is applied to determine
The performance of a specific task in CPM is known as
The performance of a specific task in CPM is known as
Job evaluation is the method of determining the
Job evaluation is the method of determining the
Inventory management consists of
Inventory management consists of
Which of the following is independent of sales forecast?
Which of the following is independent of sales forecast?
CPM has following time estimate
CPM has following time estimate
In the cost structure of a product, the selling price is determined by the factors such as
In the cost structure of a product, the selling price is determined by the factors such as
A big advantage of PERT over Gantt charts is that in the former case
A big advantage of PERT over Gantt charts is that in the former case
The artificial activity, which indicates that an activity following it cannot be started unless, the preceding activity is complete, is known as
The artificial activity, which indicates that an activity following it cannot be started unless, the preceding activity is complete, is known as
In product layout
In product layout
The average time recorded by work study man for an operation is called
The average time recorded by work study man for an operation is called
A CPM family includes
A CPM family includes
The main disadvantage of line organisation is
The main disadvantage of line organisation is
In PERT analysis, critical path is obtained by joining events having
In PERT analysis, critical path is obtained by joining events having
Pick up the correct statement about relationship between various floats
Pick up the correct statement about relationship between various floats
What does symbol 'O' imply in work study?
What does symbol 'O' imply in work study?
Critical Path Net Work helps an engineer
Critical Path Net Work helps an engineer
Which one of the following techniques is used for determining allowances in time study?
Which one of the following techniques is used for determining allowances in time study?
The first method invented for planning projects was
The first method invented for planning projects was
Gantt chart gives information about
Gantt chart gives information about
Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?
Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?
If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good
If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good
Bin card is used in
Bin card is used in
Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it
Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it
Work study comprises following main techniques
Work study comprises following main techniques
Which of the following equations is not in conformity with others?
Which of the following equations is not in conformity with others?
String diagram is used when
String diagram is used when
Expediting function consists in keeping a watch on
Expediting function consists in keeping a watch on
The critical activity has
The critical activity has
The main object of scientific layout is
The main object of scientific layout is
Material handling in automobile industry is done by
Material handling in automobile industry is done by
The grouping of activities into organizational units is called
The grouping of activities into organizational units is called
Work study is concerned with
Work study is concerned with
Both Rowan plan and 50-50 Halsey plan will provide the same earning when the actual time is _________ the standard time.
Both Rowan plan and 50-50 Halsey plan will provide the same earning when the actual time is _________ the standard time.
The main advantage of line organisation is its
The main advantage of line organisation is its
Current assets include
Current assets include
In process layout
In process layout
PERT analysis is based on
PERT analysis is based on
When slack of an activity is positive
When slack of an activity is positive
String diagram is used
String diagram is used
A systematic job improvement sequence will consist of
A systematic job improvement sequence will consist of
The time which results in the least possible direct cost of an activity is known as
The time which results in the least possible direct cost of an activity is known as
The two bin system is concerned with
The two bin system is concerned with
Critical path moves along the activities having total float of
Critical path moves along the activities having total float of
Simplex method is the method used for
Simplex method is the method used for
The aim of value engineering is to
The aim of value engineering is to
Standard time is defined as
Standard time is defined as
In order that linear programming techniques provide valid results
In order that linear programming techniques provide valid results
A low unit cost can be obtained by following
A low unit cost can be obtained by following
In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches
In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches
For a product layout the material handling equipment must
For a product layout the material handling equipment must
When slack of an activity is negative
When slack of an activity is negative
The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)
The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)
The value engineering technique in which experts of the same rank assemble for product development is called
The value engineering technique in which experts of the same rank assemble for product development is called
The term 'value' in value engineering refers to
The term 'value' in value engineering refers to
Which of the following statement is correct?
Which of the following statement is correct?
Activity slack or float of any event on a PERT/CPM chart is represented by
Activity slack or float of any event on a PERT/CPM chart is represented by
If TL is the largest allowable event occurrence time, total activity slack (s) is equal to
If TL is the largest allowable event occurrence time, total activity slack (s) is equal to
Dummy activities are used to
Dummy activities are used to
Scheduling gives information about
Scheduling gives information about
Travel charts provide
Travel charts provide
Routing prescribes the
Routing prescribes the
Line organization is suitable for
Line organization is suitable for
Merit rating is the method of determining the
Merit rating is the method of determining the
Gantt charts provide information about
Gantt charts provide information about
What does symbol 'D' imply in work study?
What does symbol 'D' imply in work study?
Work study is most useful
Work study is most useful
The routing function in a production system design is concerned with
The routing function in a production system design is concerned with
Slack of various events on the critical path in PERT/CPM chart
Slack of various events on the critical path in PERT/CPM chart
The main objective of work measurement is to
The main objective of work measurement is to
In micro-motion study, therblig is described by
In micro-motion study, therblig is described by
Merit Rating is the method of determining worth of
Merit Rating is the method of determining worth of
Tick the odd man out
Tick the odd man out
Which of the following statement is correct?
Which of the following statement is correct?
Time study is carried out
Time study is carried out
The production scheduling is simpler and high volume of output and high labour efficiency are achieved in the case of
The production scheduling is simpler and high volume of output and high labour efficiency are achieved in the case of
In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if
In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if
The assumption in PERT is
The assumption in PERT is
Replacement studies are made on the following basis
Replacement studies are made on the following basis
Travel charts are used to
Travel charts are used to
A critical activity has
A critical activity has
Which of the following conditions are necessary for applying linear programming?
Which of the following conditions are necessary for applying linear programming?
The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store
The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store
F. W. Taylor introduced a system of organisation known as
F. W. Taylor introduced a system of organisation known as
Basic motion time study gives times for basic motions in ten thousandths of
Basic motion time study gives times for basic motions in ten thousandths of
Acceptance sampling is widely used in
Acceptance sampling is widely used in
Percent idle time for men or machines is found by
Percent idle time for men or machines is found by
Acceptance sampling is used in
Acceptance sampling is used in
Queueing theory is used for
Queueing theory is used for
The salient feature of functional organisation is
The salient feature of functional organisation is
The critical path of a network represents
The critical path of a network represents
The product layout
The product layout
In a line organization
In a line organization