Process layout is also known as
Process layout is also known as
The production cost per unit can be reduced by
The production cost per unit can be reduced by
Process layout is employed
Process layout is employed
Earliest finish time can be regarded as
Earliest finish time can be regarded as
The important file in making a PERT is
The important file in making a PERT is
Actual performance of a task is called
Actual performance of a task is called
The break-even point represents
The break-even point represents
Which of the following type of layout is suitable for automobile manufacturing concern?
Which of the following type of layout is suitable for automobile manufacturing concern?
A-B-C analysis
A-B-C analysis
Which of the following statement is correct about the network diagram?
Which of the following statement is correct about the network diagram?
The essential condition for the decompression of an activity is that
The essential condition for the decompression of an activity is that
Which of the following incentive plans ensures a part of the swing to the worker and rest to the employer?
Which of the following incentive plans ensures a part of the swing to the worker and rest to the employer?
Standard time is equal to
Standard time is equal to
In break even analysis, total cost consists of
In break even analysis, total cost consists of
Father of industrial engineering is
Father of industrial engineering is
PMTP (predetermined motion time systems) include
PMTP (predetermined motion time systems) include
In break-even analysis, total cost consists of
In break-even analysis, total cost consists of
Product layout is also known as
Product layout is also known as
The most popular type of organisation used for Civil Engineering Constructions is
The most popular type of organisation used for Civil Engineering Constructions is
The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as
The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as
Routing is essential in the following type of industry
Routing is essential in the following type of industry
In A-B-C analysis, which class of items are generally large in number?
In A-B-C analysis, which class of items are generally large in number?
Military organisation is known as
Military organisation is known as
An activity of the project is graphically represented by ________ on the network diagram.
An activity of the project is graphically represented by ________ on the network diagram.
Standing orders which are statutory are applicable to
Standing orders which are statutory are applicable to
In fixed position layout
In fixed position layout
A dummy activity in a net work diagram
A dummy activity in a net work diagram
Inventory control in production, planning and control aims at
Inventory control in production, planning and control aims at
According to MAPI formula, the old machine should be replaced by new one when
(Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum)
According to MAPI formula, the old machine should be replaced by new one when
(Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum)
Gantt charts are used for
Gantt charts are used for
The type of organisation preferred for an automobile industry, is
The type of organisation preferred for an automobile industry, is
The work study is done by means of
The work study is done by means of
Which of the following layouts is suited for mass production?
Which of the following layouts is suited for mass production?
In perpetual inventory control, the material is checked as it reaches its
In perpetual inventory control, the material is checked as it reaches its
The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as
The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as
P.M.T.S. (Predetermined Motion Time Systems) include
P.M.T.S. (Predetermined Motion Time Systems) include
Product layout is best suited where
Product layout is best suited where
Routing assists engineers in deciding in advance
Routing assists engineers in deciding in advance
Which one of the following chart gives simultaneously information about the progress of work and machine loading?
Which one of the following chart gives simultaneously information about the progress of work and machine loading?
Which of the following are the guidelines for the construction of a network diagram?
Which of the following are the guidelines for the construction of a network diagram?
ABC analysis deals with
ABC analysis deals with
In which of the following layouts, the lines need to the balanced
In which of the following layouts, the lines need to the balanced
The determination of standard time in a complex job system is best done through
The determination of standard time in a complex job system is best done through
The most important objective behind plant layout is
The most important objective behind plant layout is
Valve analysis is particularly of interest when
Valve analysis is particularly of interest when
A-B-C analysis is used in
A-B-C analysis is used in
Monte Carlo solutions in queuing theory are extremely useful in queuing problems
Monte Carlo solutions in queuing theory are extremely useful in queuing problems
Which of the following depreciation system ensures that the interest be charged on the cost of machine asset every year on the book value, but the rate of depreciation every year remains constant
Which of the following depreciation system ensures that the interest be charged on the cost of machine asset every year on the book value, but the rate of depreciation every year remains constant
According to Rowan plan of wage incentive system, bonus is paid to a worker
According to Rowan plan of wage incentive system, bonus is paid to a worker
The process layout is best suited where
The process layout is best suited where
In CPM, the cost slope is determined by
In CPM, the cost slope is determined by
In manufacturing management, the term 'Dispatching' is used to describe
In manufacturing management, the term 'Dispatching' is used to describe
In value engineering, important consideration is given to
In value engineering, important consideration is given to
Time study is used to
Time study is used to
In Emerson's efficiency plan of wage incentive system, bonus is paid to a worker
In Emerson's efficiency plan of wage incentive system, bonus is paid to a worker
Frederick W. Taylor introduced a system of working known as
Frederick W. Taylor introduced a system of working known as
The difference between the time available to do the job and the time required to do the job, is known as
The difference between the time available to do the job and the time required to do the job, is known as
Military type of organisation is known as
Military type of organisation is known as
CPM stands for
CPM stands for
A dummy activity
A dummy activity
The employees provident fund act is applicable to
The employees provident fund act is applicable to
Product layout is used for
Product layout is used for
Pick up the incorrect statement about advantages of work sampling
Pick up the incorrect statement about advantages of work sampling
Which of the following statement is wrong?
Which of the following statement is wrong?
A diagram showing the path followed by men and materials while performing a task is known as
A diagram showing the path followed by men and materials while performing a task is known as
Fixed position layout is also known as
Fixed position layout is also known as
The mathematical technique for finding the best use of limited resources in an optimum manner is known as
The mathematical technique for finding the best use of limited resources in an optimum manner is known as
Templates are used for
Templates are used for
Service time in queuing theory is usually assumed to follow
Service time in queuing theory is usually assumed to follow
The simplex method is the basic method for
The simplex method is the basic method for
Performance rating is equal to
Performance rating is equal to
Pick up the incorrect statement from the following. A critical ratio scheduling
Pick up the incorrect statement from the following. A critical ratio scheduling
The most suitable incentive plan for the maintenance section of an industry will be
The most suitable incentive plan for the maintenance section of an industry will be
The technique of value analysis can be applied to
The technique of value analysis can be applied to
A milestone chart
A milestone chart
Which of the following organizations is best suited for steel plants
Which of the following organizations is best suited for steel plants
The time of completing a project in network analysis is given by following time of the critical activity meeting at the final triode
The time of completing a project in network analysis is given by following time of the critical activity meeting at the final triode
Which of the following wage incentive plan is applied to all workers?
Which of the following wage incentive plan is applied to all workers?
Work study is done with the help of
Work study is done with the help of
The unit cost in case of batch production is __________as compared to jobbing production.
The unit cost in case of batch production is __________as compared to jobbing production.
The interchangeability can be achieved by
The interchangeability can be achieved by
Statistical quality control techniques are based on the theory of
Statistical quality control techniques are based on the theory of
CPM requires
CPM requires
Queueing theory deals with problems of
Queueing theory deals with problems of
An optimum project schedule implies
An optimum project schedule implies
'O' on a PERT/CPM chart represents
'O' on a PERT/CPM chart represents
Bar charts are suitable for
Bar charts are suitable for
Gantt chart is used for
Gantt chart is used for
Linear programming can be applied successfully to
Linear programming can be applied successfully to
The objective of time study is to determine the time required to complete a job by
The objective of time study is to determine the time required to complete a job by
At the break-even point,
At the break-even point,
Which of the following are the principles of material handling?
Which of the following are the principles of material handling?
Indirect expenses include
Indirect expenses include
Direct expenses include
Direct expenses include
In the Halsey 50-50 plan, the following are rewarded more
In the Halsey 50-50 plan, the following are rewarded more
Choose the wrong statement Time study is used to
Choose the wrong statement Time study is used to
Basic tool in work study is
Basic tool in work study is
For handling materials during manufacture of cement, a _________ is widely used.
For handling materials during manufacture of cement, a _________ is widely used.