The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is
The minimum width of a septic tank is taken
The minimum width of a septic tank is taken
The correct Prismoidal formula for volume is
The correct Prismoidal formula for volume is
Pick up the incorrect statement from the following:
Pick up the incorrect statement from the following:
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is
The assumption on which the trapezoidal formula for volumes is based, is
The assumption on which the trapezoidal formula for volumes is based, is
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
The measurement is made in square metre in case of
The measurement is made in square metre in case of
The rate of payment is made for 100 cu m (per % cu m) in case of
The rate of payment is made for 100 cu m (per % cu m) in case of
The measurement is made for stone work in square metre in case of
The measurement is made for stone work in square metre in case of
According to ISI method of measurement, the order of the sequence is
According to ISI method of measurement, the order of the sequence is
Pick up the correct statement from the following:
Pick up the correct statement from the following:
Brick walls are measured in sq. m if the thickness of the wall is
Brick walls are measured in sq. m if the thickness of the wall is
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is
Pick up the item whose weight is added to the weight of respective item, is
Pick up the item whose weight is added to the weight of respective item, is
Pick up the excavation where measurements are made in square meters for payment.
Pick up the excavation where measurements are made in square meters for payment.
While preparing a detailed estimate
While preparing a detailed estimate
The item of steel work which is measured in sq.m, is
The item of steel work which is measured in sq.m, is
Pick up the correct statement from the following:
Pick up the correct statement from the following:
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
In the mid-section formula
In the mid-section formula
Pick up the correct statement regarding the centre line method of estimating a building
Pick up the correct statement regarding the centre line method of estimating a building
Size, capacity and materials need be specified for
Size, capacity and materials need be specified for
The value of 'C' of Indian type W.C. shown in the given figure is:

The value of 'C' of Indian type W.C. shown in the given figure is:

The most reliable estimate is
The most reliable estimate is
The value of 'A' of Indian type W.C. shown in the given figure is:

The value of 'A' of Indian type W.C. shown in the given figure is:

Pick up the incorrect statement from the following:
Pick up the incorrect statement from the following:
The height of the sink of wash basin above floor level is kept
The height of the sink of wash basin above floor level is kept
Pick up the incorrect statement regarding a master trap from the following:
Pick up the incorrect statement regarding a master trap from the following:
The area is measured correct to the nearest
The area is measured correct to the nearest
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
Cost of fittings and their fixing is specified for the following sanitary fittings
Cost of fittings and their fixing is specified for the following sanitary fittings
While estimating the qualities for the construction of a building, the correct metric unit is
While estimating the qualities for the construction of a building, the correct metric unit is
The expected out turn of half brick partition wall per mason per day is
The expected out turn of half brick partition wall per mason per day is
Pick up the correct statement from the following:
Pick up the correct statement from the following:
The trap which is provided to disconnect the house drain from the street sewer is called
The trap which is provided to disconnect the house drain from the street sewer is called
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.
The value of 'B' of Indian type W.C. shown in the given figure is:

The value of 'B' of Indian type W.C. shown in the given figure is:

While estimating a reinforced cement structure, the omitted cover of concrete is assumed
While estimating a reinforced cement structure, the omitted cover of concrete is assumed
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
Anti-siphonage pipe is connected to
Anti-siphonage pipe is connected to
Berms are provided in canals if these are
Berms are provided in canals if these are
Carpet area does not include the area of
Carpet area does not include the area of
The area of the cross-section of a road fully in banking shown in the given figure, is

The area of the cross-section of a road fully in banking shown in the given figure, is

For the construction of buildings, the subheads of the estimate are
For the construction of buildings, the subheads of the estimate are
The item of the brick structure measured in sq.m, is
The item of the brick structure measured in sq.m, is
The volume is measured correct to the nearest
The volume is measured correct to the nearest
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is

The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is

The weight of an item is measured correct to nearest
The weight of an item is measured correct to nearest
Pick up the correct statement from the following:
Pick up the correct statement from the following:
The expected out turn for earth work in excavation in ordinary soil per workman per day is
The expected out turn for earth work in excavation in ordinary soil per workman per day is
According to Indian Standards Institute, the actual size of modular bricks is
According to Indian Standards Institute, the actual size of modular bricks is
The damp proof course (D.P.C.) is measured in
The damp proof course (D.P.C.) is measured in
Pick up the correct statement from the following:
Pick up the correct statement from the following:
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is

The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is

Referring of given figure, pick up the correct statement from the following:

Referring of given figure, pick up the correct statement from the following:

The rate of an item of work depends on
The rate of an item of work depends on
The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is
The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is
The brick work is not measured in cu m in case of
The brick work is not measured in cu m in case of
Pick up the correct statement from the following:
Pick up the correct statement from the following:
The detention period in a septic tank is assumed
The detention period in a septic tank is assumed
In case of laying gullies, siphons, intercepting traps, the cost includes
In case of laying gullies, siphons, intercepting traps, the cost includes
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
The measurement is not made in square meters in case of
The measurement is not made in square meters in case of
The plinth area of a building not includes
The plinth area of a building not includes
The unit of measurement is per quintal for the following:
The unit of measurement is per quintal for the following:
The brick work is measured in sq metre, in case of
The brick work is measured in sq metre, in case of
The slope of the outlet of 'P trap' below the horizontal is kept
The slope of the outlet of 'P trap' below the horizontal is kept
Pick up the correct statement from the following:
Pick up the correct statement from the following:
Pick up the incorrect statement from the following:
Pick up the incorrect statement from the following:
The cross-sections for a highway is taken at
The cross-sections for a highway is taken at
The floor area includes the area of the balcony up to
The floor area includes the area of the balcony up to
The expected out turn of 12 mm plastering with cement mortar is
The expected out turn of 12 mm plastering with cement mortar is
The concrete work for the following part of the building of specified thickness is measured in square meters
The concrete work for the following part of the building of specified thickness is measured in square meters
The cross-sectional area of the embankment of a canal fully in embankment in the given figure is

The cross-sectional area of the embankment of a canal fully in embankment in the given figure is

The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is

The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is

Pick up the correct statement in case of water supply.
Pick up the correct statement in case of water supply.
The order of booking dimensions is
The order of booking dimensions is
The 'centre line method' is specially adopted for estimating
The 'centre line method' is specially adopted for estimating
Pick up the item of work not included in the plinth area estimate
Pick up the item of work not included in the plinth area estimate
The inspection pit or chamber is a manhole provided in a base drainage system
The inspection pit or chamber is a manhole provided in a base drainage system
Pick up the correct statement from the following:
Pick up the correct statement from the following:
Pick up the correct statement from the following:
Pick up the correct statement from the following:
The main factor to be considered while preparing a detailed estimate, is
The main factor to be considered while preparing a detailed estimate, is
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
Pick up the correct statement from the following:
Pick up the correct statement from the following:
The following item of earth work is not measured separately.
The following item of earth work is not measured separately.
The expected out turn of 2.5 cm cement concrete floor per mansion per day
The expected out turn of 2.5 cm cement concrete floor per mansion per day
Pick up the incorrect statement from the following:
Pick up the incorrect statement from the following: